MCNADOES CORPORATION · WICHITA, KS · EST. 2019 CLIENT PORTAL LOGIN
McNadoes Corporation
Services / Site Excavation

Site Excavation

Foundation prep for commercial and agricultural builds. Our AI determines rotation speed, approach vector, and dwell time. Target depth achieved within ±18 inches. We understand that is a tolerance some clients find either impressive or concerning, and we are prepared to discuss both reactions.

±18"
Depth Tolerance
100%
Pre-Service Survey
0
Unintended Dig Sites
AI
Guided Dwell Time

What We Do

McNadoes provides tornado-directed excavation for commercial site preparation and agricultural land clearing. Our AI guidance system determines optimal tornado classification, rotational approach vector, and target dwell time to achieve the specified excavation depth. Target depth is achieved within an 18-inch tolerance.

For projects where that tolerance is insufficient, we recommend conventional excavation, or a conversation about adjusting your project parameters. The tolerance is the tolerance. We are transparent about this upfront because we find that clients who learn about the tolerance after the fact are less satisfied than clients who knew about it beforehand.

All excavation contracts include a pre-service geological survey. This is not optional. We need to know what is under the site before we tell the tornado to remove it. On two occasions we have found things our clients did not know were there. We have a policy about this.

The Process

1.
Site Assessment
Our team conducts a geological and topographical survey of the target site. We identify depth requirements, subsurface conditions, utility clearances, and anything else that would affect the deployment or the outcome.
2.
AI Configuration
The atmospheric guidance platform calculates optimal tornado classification, approach vector, rotational speed, and dwell time based on your target depth specification and site conditions.
3.
Deployment
The tornado is deployed to specification. Our operations team monitors the event in real time and can adjust guidance parameters within the deployment window.
4.
Post-Service Survey
Aerial documentation confirms excavation scope and depth across the site footprint. Survey report delivered within 48 hours.
Service Specifications
Depth tolerance ±18 inches
Site types Commercial, agricultural
Pre-service survey Included
Geological assessment Included
Post-service survey Included
Fill removal Included
Utility coordination Client responsibility
All utility locating is the responsibility of the client prior to service. McNadoes is not responsible for subsurface infrastructure that was not disclosed during the pre-service assessment.
Submit a Project Inquiry Hardship Review Application

View the full service catalog.

Six core service lines across municipal, commercial, and agricultural applications.

All Services →